Fire hydrant system commissioning tests do not satisfy the test requirements for fire brigade booster connection compliance as required by as 2419 3 2012.
Fire hydrant booster assembly requirements.
Fire australia co pty ltd offers broad range of fire hydrant risers fire hydrant fittings fire hydrant valves fire hydrant risers pipe fire hose reels hydrant boosters fire cabinets of best quality.
Ensure adequate parking for fire appliances.
Booster and hydrant assemblies consist of arrangements of valves pipe work to suit specific site fire protection needs.
The performance requirements of the ncc if a fire brigade booster assembly is incorporated in the design.
03 9764 0020 for more information about any fire protection equipment.
The site needs to have appropriate parking space available for the fire appliances to park whilst within reach of the fire hydrant booster system.
Please nominate connections lh or rh entry either butterfly or gate valves required to suit relevant authority requirements.
Flow requirements qfes expect that the flow and pressure of the street hydrant is tested to ensure compliance with australian standard as 2419 1 2005 table 2 1 and shall be capable of discharging no less than.
Fire hydrants for minor residential development pdf fire safety in waste facilitites pdf guidelines for bulk storage of rubber tyres pdf impulse fans in car parks pdf technical information sheets.
Hazardous chemicals manifest pdf fire brigade booster connection with inlet insert pdf fire hydrant concessions for existing buildings pdf.
Assess the site for the safety and logistical requirements to carry out the test.
This may be as simple as an attack hydrant requirement such as a dual hydrant riser or a more complicated fire brigade quad booster point complete with feed hydrants isolating and check valves.
The location of the fire brigade booster should be chosen to ensure that it is readily accessible and provide protection to fire fighters.
Fire brigade test pressure is 1700kpa all booster units can be supplied as individual components or fully part assembled.
Fire brigade booster assembly installed external attack hydrant pressure and flow requirements apply additional pressure and flow capacity when boosted internal attack hydrant pressure and flow different requirements as 2419 1 public comment draft.
Determine if road closure or traffic diversion is required.